| Adaptive PE/Dance | $1,000,000 | Renovate portions of the Adaptive PE/Dance building: new interiors, mechanical, electrical, and plumbing systems, seismic upgrade, new roof and windows, added storage. |
| Administration HVAC Upgrades | $1,550,000 | Upgrade existing HVAC units with controls, variable refrigerant flow, and split systems for improved comfort in the building. |
| Baseball Field | $250,000 | Improve portions of the Baseball Field: new concessions booth, entrance, restrooms, team and coaching spaces/rooms, replace dugouts, new sports lights, batting cages and fencing, and add Wi-Fi. |
| Campus-wide Building Management System (BMS) | $3,100,000 | Upgrade to new Building Management System (BMS) in all campus buildings not planned for renovation. |
| Early Childhood Education (ECE) | $4,280,000 | Improvements to the Early Childhood Education building include: interior and exterior paint, replace flooring, add energy efficient lighting, upgraded hardware switches, uninterrupted power supplies, new fiber runs, expanded Wi-Fi access points, classroom technology upgrades, new Building Management System (BMS), door hardware replacement, new roofs, replacement of HVAC equipment, kitchen equipment upgrades, window shade retrofits, and site improvements to play structures including phase three outdoor learning center. |
| Elevator Upgrades at BMC and Humanities | $400,000 | Business, Math, Computing Building (BMC) and Humanities elevator modernization for increased durability and reliability, increased fire and life safety features, decreased waiting times, reduced energy consumption, reduced operational costs and reduced troubleshooting time. |
| Enterprise Resource Planning System (ERP) | $15,000,000 | New district Enterprise Resource Planning System (ERP).
|
| Fitness Center All Gender Locker Rooms | $390,000 | Renovate existing fitness center unisex restrooms to become gender neutral
locker rooms. |
| Gym HVAC and Roof | $810,000 | Replace Thermoplastic Polyolefin (TPO) roofs and replace all HVAC equipment on upper rooftop at Gym. |
| Lecture Forum | $7,100,000 | Renovate portions of the Lecture Forum: new interiors and exteriors, mechanical, electrical, and plumbing systems, seismic upgrade, new roof and windows, added storage, expanded Wi-Fi access points, and smart classrooms. |
| Library Technology Center (LTC) | $7,600,000 | Interior renovation of the Library Technology building to meet new programming needs. Renovation will include expansion of existing Academic Support Centers, Tutoring and Academic Success Center, STEM Cohort Enhanced Learning, Reading & Writing Center, addition of the Math Learning Center, revision of existing LTC and Student Services spaces, addition of new testing lab on second floor. Building Improvements to include electrical, mechanical, and plumbing improvements, new partitions and doors, new finishes and flooring. Replacement the existing fire alarm system and sprinklers throughout the building. Installation of building-wide HVAC control system, audio-visual systems for small meeting rooms and energy efficient lighting throughout.
(New HVAC and Roofing are being performed under Quick Start Projects.)
|
| LTC Roof and HVAC | $2,320,000 | Replace asphalt roof with Thermoplastic Polyolefin (TPO) on upper flat roof and replace all HVAC equipment on rooftop. |
| Marina Campus Expansion | $78,000,000 | The expansion of the Marina Education Center campus may include: new buildings to the east of the existing campus with Science, Nursing, Hospitality and Student Services/Support/ Facilities and Early Childhood Education. |
| Music Building | $17,500,000 | New construction of Music Building to include a large choral and recital classroom space, practice rooms, control booth, staff offices, instrumental classrooms, and support spaces. |
| Smart Classrooms | $3,000,000 | Upgrade smart classroom technology across all campuses (approximately 75 classrooms).
|
| Student Services | $2,100,000 | Improve portions of the existing Student Services building: interior and exterior paint, replace flooring, add energy efficient lighting, upgraded hardware switches, uninterrupted power supplies, new fiber runs, expanded Wi-Fi access points, upgrade smart conference rooms, new Building Management System (BMS), replace roof, replace HVAC, replace elevator, refinish handrails, address leaks and poor drainage. |
| Welcome Center | $18,000,000 | Demolish existing General Classroom /Welcome Center dilapidated residential style army building. Design and construct new Campus Welcome Center to serve as the main hub for student programs at the Monterey Campus. New building program will include added square footage for additional student programs such as Umoja, El Centro, Women's Center, LGBTQIA+, Career & Transfer Center, etc. along with nap pods, quiet room for meditation/prayer, outdoor lounge area, gender-neutral bathrooms/shower, private lactation room, and changing table. |