| Art Dimensional | $1,500,000 | Renovate portions of the Art Dimensional building: new interiors and exteriors, mechanical, electrical, and plumbing systems, seismic upgrade, new roof and windows, added storage, expanded Wi-Fi access points, and smart classrooms. The program that the building supports is heavy into tech with laser scanners, laser printers, CNC machines, digital mills, all computer reliant. Robust power and data are needed for support. Program has potential for job creating enrollment at the college. Two new boilers and pumps were installed recently.
(Candidate for additional State Funding) |
| Art Drafting | $500,000 | Renovate portions of the Art Drafting building includes: new interiors, mechanical, electrical, and plumbing systems, seismic upgrade, new windows, expanded Wi-Fi access points, and smart classrooms.
|
| Data Center | $1,500,000 | Scope of work includes, but is not limited to: upgrades to Active Directory, File Servers, Print Servers, Call Manager (VoIP), Local Storage, SIS System, Network Security (e.g. firewalls), Core Switch, Wireless Controller, and VPN systems. |
| Data Infrastructure | $850,000 | Add/replace fiber infrastructure and add/replace wireless access points.
|
| Gender-Neutral Restrooms | $500,000 | Convert eight restrooms across campuses into gender-neutral. |
| International Center (Repurpose) | $500,000 | A complete renovation of the International Center includes: new interiors and exteriors, mechanical, electrical, and plumbing systems, seismic upgrade, new roof and windows, added storage. |
| Life Science | $2,000,000 | Improve portions of the Life Science building: interior and exterior paint, add energy efficient lighting, upgraded hardware switches, uninterrupted power supplies, new fiber runs, expanded Wi-Fi access points, classroom and conference room technology upgrades, HVAC refresh, roof replacement, and elevator replacement.
|
| Marina Education Center | $0 | Improve portions of the existing Marina Education Center: interior and exterior paint, add energy efficient lighting, gender-neutral restroom retrofit, and landscape upgrades.
(Classroom and conference room technology upgrades are captured in Quick Start Projects.) |
| Physical Science (PS) | $1,500,000 | Improve portions of the Physical Science building: interior and exterior paint, add energy efficient lighting, HVAC replacement, roof replacement, elevator replacement, add wall/sound proof barrier between PS 202 and PS 206, address air balance issues in the classrooms (rework ductwork in hallways to be less restrictive in order to push air to the southern classrooms and be less noisy). |
| Public Safety and Training Center (MOUT Site) | $25,000,000 | New Public Safety Training Center at the Marina Campus that includes new Public Safety training center offices, classrooms, storage, mat room, indoor and outdoor instructional areas, slow speed pad, agility course, and small track. Development of EVOC course, indoor firing range and fire training facility at a secondary location. |
| Site Improvement, Security and Infrastructure | $10,000,000 | Address amphitheater, ADA walkways, replace truncated domes, replace exposed aggregate concrete, tree trimming, refinish Lecture Forum Bridge, clean up ravine, benches, fencing and gates, campus sign and wayfinding signage, site lighting upgrades, and new main electrical distribution, parking lot resealing and restriping, replace parking lot ticket machines, add electric vehicle charging stations, add wireless accesses points and security cameras in parking lots. |
| Social Science | $4,800,000 | A complete renovation of the Social Science building includes: new interiors and exteriors, mechanical, electrical, and plumbing systems, seismic upgrade, new roof and windows, added storage, expanded Wi-Fi access points, smart classrooms, and computer labs. |
| Technology Upgrades | $2,000,000 | New servers, switches, uninterrupted power source, and wireless access points at buildings that did not receive full renovation scope as well as upgrades of other technology solutions. |
| Theater | $1,000,000 | Improve portions of the Theater: new energy efficient lighting, HVAC refresh, new electrical service and new sound system. |