Description:
Cañada College Building 5 – Provide infrastructure from existing transfer
switch in Building 8 to existing refrigerators and freezers.
- CSM Building 10 - Provide new manual transfer switch in Building 10 and
infrastructure from transfer switch to existing refrigerators and freezers.
- CSM Building 1 – Building 1 currently has a manual transfer switch which
powers the campus MPOE, 1 conference room and 1 office. Expand capacity
of current manual transfer switch to provide power to the entire building.
- Skyline College Building 6 - Provide infrastructure from existing transfer
switch in Building 6 to existing refrigerator and freezers.
Budget:
$57,947
Status:
Cancelled
Master Bond Project List Type:
• II.H - Upgrade College emergency and disaster response systems, in coordination with City and County agencies